TRACTION POWER NETWORK PROTECTION
DATE : 22-23 March 2027, 9am -5pm AEDT Sydney Time
Your Title Goes Here
Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.
Download Brocure
Introduction
Electric railways date back to the 1840s. The original relatively low voltage Direct Current (DC) systems are still in use throughout the world. Alternating Current (AC) systems with comparatively higher voltages have become prevalent in more recent times. Although it is over 170 years old, railway electrification technology is still very relevant with massive developments throughout the world including Australasia. The overarching objective of traction power protection systems is to ensure fast, reliable, and selective clearance of unwanted conditions within the traction power network. In other words, to ensure safety of personnel, public and equipment, while minimizing disruptions to the rail traffic. The protection systems are therefore a critical part of the traction power network and understanding how they operate and how to design them is essential for the safe and reliable operation of an electric railway.
Why Study Traction Power Network Protection?
Due to their inherent nature, traction networks are in many ways unlike any other electric networks. Firstly, they are single phase, eliminating the “√3” from the calculations. Secondly, the network topologies, ranging from relatively simple DC rail networks to highly complex AC autotransformer networks, result in peculiar current distributions affecting the power flow and short circuit analysis, and subsequently the protection philosophy and calculations. Finally, even though it is a “mature” technology, it is still going through major innovations, with the introduction of the new technologies, such as Static Frequency Converters, which have a significant impact on protection systems.
In many cases the protection system cannot prevent faults from occurring, but it can and must limit their effects. As with conventional power networks, the protection schemes must detect faults, but also apply discrimination in isolating the faulty section, and prevent spurious operations during healthy conditions which may appear as faults. In this context railways present as
a unique problem. The “loads” (trains) are travelling along the protected railway sections and may also act as generators if the locomotives are operating in regenerative braking mode, and with high inrush currents from the locomotive supply transformers. The 2x25kV Auto Transformer systems are particularly of interest with non-linear feeder impedances, and the effect of Auto Transformer inrush during energization of track feeder sections. Single phase Harmonic Filters are commonly used in traction networks and must be adequately protected from fault conditions, but also from causing unwanted conditions to the traction network. The nature of the traction networks with high load and particularly high inrush currents vs often comparatively low fault currents has resulted in development of protection schemes which are not commonly seen in conventional networks.
Who Should Attend?
This seminar focuses on providing a high-level understanding of traction power network protection principles with practical examples from the presenter’s experience.
The seminar is particularly aimed at:
- Protection engineers
- Circuitry design engineers
- Project engineers and project managers
- Commissioning engineers
- Traction power network asset engineers
- Field technicians
Topics to be covered
To see full seminar contents, click Download Brochure button below
- Introduction
- Traction Power Network and Modelling
- Current Transformer Performance for Traction Protection
- AC Traction Protection Functions
- DC Traction Protection Functions
- Typical Protection Schemes Overview
- Typical Protection Logics
- Typical Relay Configurations
Your Title Goes Here
Your content goes here. Edit or remove this text inline or in the module Content settings. You can also style every aspect of this content in the module Design settings and even apply custom CSS to this text in the module Advanced settings.
Download Brocure
About the Seminar Leader
Seminar Fees (2-Day Seminar)
Super Early-Bird Fee
If payment & registrations are received by
11 January 2027
Online Attendee
Registration Fee: (Excl. GST) : AU$1,280
Early-Bird Fee
If payment & registrations are received by
8 February 2027
Online Attendee
Registration Fee (Excl. GST) : AU$1,330
Standard Fee
Per Delegate
Online Attendee
Registration Fee (Excl. GST) : AU$1,380
Group Discounts
CPD International recognizes the value of learning in teams. Register 3 or more delegates at the same time and receive 5% off current fee. Group Discount will compound on the top of your early-bird discount fees where applicable
Seminar Registration Form
There are 3 ways to register for CPD International Seminars, email us at register@cpdint.com.au, call us on 0450 387 277 (Winnie Motta) Or
Simply fill in the On-Line Registration Form below!